The Fixed Local Loop license is PTA's 20-year infrastructure license for operators who want to own and operate their own last-mile telecommunications network. Unlike the district-level internet license, the FLL is a full infrastructure license rather than a service license, and its application requirements reflect that: a more detailed financial commitment, a five-year business plan, and fees payable in USD rather than PKR.
This guide covers the complete application process for a single FLL region. Operators applying for multiple regions file separate applications per region, each with its own fee payment and documentation set.
Understanding the FLL Structure
An FLL license covers a specific PTA telecom region. Pakistan has 14 telecom regions and a separate application with its own processing fee and initial license fee is required for each region. The license is valid for 20 years from the date of issue. A commencement certificate must be obtained within 18 months of license issuance, confirming that the network has been built and service has commenced in the licensed region.
Fees are set in USD and payable in PKR at the National Bank of Pakistan TT selling rate on the date of payment. The application processing fee is USD 500 per region, non-refundable. The initial license fee is USD 10,000 per region. Reduced fees apply for Azad Jammu and Kashmir and Gilgit-Baltistan: confirm current reduced rates with PTA's licensing division at the time of application.
Step 1: Prepare Corporate Documents
As with the district-level license, corporate documents require the most lead time and must be current. The SECP Certificate of Incorporation must not be older than three months at the time of submission.
Required corporate documents: SECP Certificate of Incorporation (certified true copy, principal line of business must cover telecom or similar), Memorandum and Articles of Association (certified true copy), directors list with certified Form-29 including disclosure of any director's relationship to other PTA licensees, shareholders list with Form-A including equity breakdown and disclosure of any shareholder affiliate that is itself a PTA licensee or applicant, and CNIC copies for Pakistani directors and representatives (passport copies for foreign nationals).
The director and shareholder disclosure requirements for the FLL are more specific than for the district-level license: the relationship of every director to every other PTA licensee must be disclosed, and every shareholder affiliate that holds a PTA license must be identified. These disclosures are mandatory and their omission is a ground for disqualification.
Step 2: Prepare the Technical Plan
The FLL technical plan is substantially more detailed than what the district-level license requires, reflecting the scale of infrastructure commitment involved.
Required technical content: key management's telecom qualifications and experience (CVs or profiles of the technical leadership team), detailed network layout for each Network Connection Point in the licensed region, equipment list with make, model, and end-of-life status reconciled against the project cost statement, access network media and technology, a colour network layout on Google Earth showing the proposed coverage, Type Approval certificates for terminal equipment, and a written compliance plan for CTDISR-2025.
The Google Earth layout requirement is specific and often overlooked: PTA expects a geographic representation of the proposed network topology, not just a text description. Prepare this as part of the technical plan, not as an afterthought.
End-of-life status for equipment matters: proposing to build a network on equipment that is already at or near vendor end-of-life will generate questions. Your equipment choices should be supportable for a meaningful portion of the 20-year license term.
Step 3: Prepare the Five-Year Business Plan
The FLL requires a full five-year business plan, not the shorter economic viability section of the district license. The business plan must cover: areas to be served within the region and services to be offered, projected revenue by year, operating expense projections, capital expenditure requirements, and assumptions underpinning each projection.
Alongside the narrative business plan, PTA requires five-year financial projections: a balance sheet forecast, profit and loss projections, and cash flow projections, all with explicit risk assumptions. The capital structure must show at least 20% equity: a pro forma financial structure where equity is below 20% at any point in the five-year period is a disqualification ground under PTA's published criteria.
An initial project cost statement must reconcile with both the equipment list in the technical plan and the financial projections. PTA cross-references these documents, so inconsistencies between them will generate clarification requests.
Step 4: Demonstrate Financial Capacity
Financial capacity is demonstrated through bank statements and, where applicable, documentation of funding sources. Six months of company bank statements showing an average balance supporting the proposed investment is the standard requirement.
For newly formed companies where the operating history is insufficient to demonstrate capacity through statements alone, documentation of funding sources is required: shareholder commitment letters, director loan agreements, or evidence of external financing. Personal bank statements of sponsor directors are required where director loans form part of the proposed funding.
Active taxpayer registration with FBR is a separate requirement and must be evidenced in the application.
Step 5: Prepare Legal Undertakings
Three legal documents are required for the FLL application: a notarized undertaking on PKR 100 stamp paper covering no insolvency, no relevant convictions, and no PTA defaults, a notarized special power of attorney for the authorized signatory if the CEO is not personally signing the application, and a notarized affidavit from the power-of-attorney holder.
These are formal legal documents. Have them prepared by a legal professional rather than producing them informally.
Step 6: Economic Viability Report
A report on the economic viability of the proposed project and its benefit to telecom users in the target region. This is separate from the financial projections and makes the case for why the market needs this network: what coverage gaps exist, what the expected quality improvement over existing options will be, and what the contribution to PTA's connectivity objectives is.
Step 7: Pay Processing Fee and Submit
The USD 500 processing fee per region is payable by bank draft or pay order to PTA before submission. PTA will confirm the current accepted payment instruments at the time of application.
Submit the complete package: application letter addressed to the Director General (Licensing), all corporate documents, the technical plan, five-year business plan, financial projections, bank statements, legal undertakings, economic viability report, and proof of fee payment. Include a complete scanned soft copy of the full application.
After Submission
PTA targets a 2-3 week evaluation timeline for complete applications. Incomplete applications are returned rather than queued. If PTA requests additional information during evaluation, respond completely and promptly: delays in responding extend the overall timeline on your side, not PTA's.
On approval, PTA issues the license with conditions including the 18-month commencement certificate requirement and CTDISR-2025 compliance obligations. For operators who need support designing the network before applying, Network Design & Optimization covers the technical planning work. For the complete application preparation and post-licensing compliance programme, ISP Consulting & Advisory covers the full journey.